Nuclear HVAC knowledge  Assessment

This quiz serves as a tool to evaluate your understanding and proficiency in the specialized field of nuclear heating, ventilation, and air conditioning (HVAC) systems. Your performance here will help tailor the training to your current level of knowledge and expertise. Whether you’re a seasoned Nuclear HVAC Design Engineer, Engineering Manager, Commissioning Manager, Construction Lead, HVAC Construction Engineer, Commissioning Engineer, Maintenance Engineer, Project Engineer, Supervisor, Planner/Buyer, part of the Contract & Risk Team, or a Quantity Surveyor, this assessment aims to gauge your familiarity and aptitude in this critical domain. Let’s dive in and explore your understanding before embarking on the learning journey!

 

0%

Candidate Assessment Group 1

Nuclear HVAC knowledge  Assessment

Welcome to the Nuclear HVAC Knowledge Assessment!

1 / 20

Fire and smoke dampers on site commissioning test permits are delivered by Fire brigade.

2 / 20

HEPA filter is an absolute filter to implement in nuclear ventilation design for particulate air filtration efficiency above 99,95%.

3 / 20

In nuclear power plant, direct driven centrifugal fans and axial vane fans are applicable in both radiation controlled and non-controlled areas

4 / 20

Except for reactor, fuel and waste buildings, the ventilation can be designed as conventional ventilation for others rooms in a PWR or BWR nuclear facility.

5 / 20

In situ iodine filters efficiency test must be performed for only systems connected to stack in order to ensure the protection of personnel and environment.

6 / 20

In a nuclear facility, the subpressure cascade is only required in permanent radioactive contamination zones as per ISO 17873.

7 / 20

Electrical heater is recommended upstream iodine trap in order to control humidity of impregnated charcoal and increase the efficiency of filtration

8 / 20

Fire and smoke dampers on site commissioning is under Manufacturer responsibility. The Manufacturer must check the functionality of fire and some damper after erection completion.

9 / 20

Select the correct statement (s):

10 / 20

Select to correct statements? (More than one answer)

11 / 20

Nuclear safety requirement is only applicable to physical elements (structure, system and components) of Nuclear ventilation

12 / 20

What is the correct description in order for following components ?

13 / 20

Select the correct statement regarding aeraulic principle (s)

14 / 20

System check is not mandatory to start commissioning activity as all evidences, inspection protocol and certificates will be provided at end of construction phase.

15 / 20

What is the definition of ALARP for nuclear ventilation ?

16 / 20

Fire and smoke barriers are related measures and strategy agreed between nuclear power plant operator and designers to prevent fire and spreading.

17 / 20

Fire can be used in normal operation if needed by operator to isolate a normal ventilation ductwork.

18 / 20

What are the correct behaviors when approaching radiation controlled areas ?

19 / 20

Glove boxes and fume Cupboard ventilation and filtration must be achieved by a separated system before connection to main exhaust lines.

20 / 20

The relative humidity is a mandatory nuclear safety function to fulfill in radiation controlled areas

Your score is

0%